So, you’ve decided to go solar—congratulations! You’re on your way to reducing your electricity bills, lowering your carbon footprint, and increasing your home’s value. But before the sun starts powering your home, there’s one important milestone: solar panel installation.
Whether you’re still exploring options or you’ve already signed a contract, understanding the installation process can help ease concerns and ensure a smooth experience.
In this blog post, we’ll walk you through everything you can expect during the solar panel installation process, including:
How to prepare before the big day
Step-by-step overview of the installation
Timelines and potential delays
Inspection and activation
Tips for a hassle-free experience
Let’s dive in and demystify what happens when your solar journey begins—literally—on your roof.
The process of going solar doesn’t happen overnight. It’s a multi-stage journey that typically involves:
Site evaluation and engineering
Permitting and paperwork
Installation day(s)
Inspection and approval
System activation
Understanding these steps will help set realistic expectations and reduce surprises along the way.
What to Expect:
Once you’ve chosen your solar installer, they’ll schedule a site evaluation or home assessment. This usually involves a visit from a technician, engineer, or site surveyor.
What happens during this step?
Roof inspection: Pitch, material, shading, and orientation
Electrical panel check: Ensures your current panel can support a solar system
Attic inspection (if necessary): For wiring and structural integrity
Measurement and photographs: Helps design the most efficient panel layout
Discussion of any obstacles: Trees, vents, chimneys, or HOA rules
💡 Tip: Clear access to your attic, roof, and electrical panel will speed things up!
1–2 hours for the visit, followed by a few days to finalize the design.
What to Expect:
After your site evaluation, your installer will create a custom system design. Once approved, the company will handle most of the permits, applications, and paperwork for you.
This includes:
Building and electrical permits from your local municipality
Interconnection application with your utility provider
Net metering agreement (if applicable)
Homeowners’ association (HOA) approvals (if required)
Incentive or rebate applications (state/federal programs)
While this stage may seem quiet from your end, it’s a crucial and often time-consuming part of the process. Some cities or utilities take longer than others.
💡 Tip: Ask your installer for a rough permitting timeline based on your local jurisdiction.
2–6 weeks on average, depending on your location and utility company.
What to Expect:
This is when the magic happens—your panels, inverters, wiring, and support structures are physically installed. Most residential installations take 1–3 days, depending on system size and complexity.
Crew arrival and safety setup
Technicians arrive early (usually 7–9 a.m.)
Scaffolding or roof harnesses are installed for safety
Power may be shut off temporarily
Mounting system installation
Racks are attached to the roof structure
Roof penetrations (if needed) are waterproofed and sealed
Panel installation
Solar panels are mounted and secured on the racking system
Wiring and inverter setup
Electrical wiring connects the panels to the inverter
Inverter and/or battery system is installed (garage or utility area)
Connection to electrical panel
Final connections made to your home’s circuit breaker
System testing
The system is tested for initial performance and safety
💡 Tip: Ask your installer for a walkthrough before they leave. They can show you how to read your inverter or monitor your system digitally.
1–3 days for standard residential installs. Larger or more complex systems may take longer.
What to Expect:
Before you can switch on your solar system, it needs to be inspected and approved by your city or county and your utility provider.
Municipal inspection
A building or electrical inspector visits your property
Checks installation against local code and safety standards
Utility inspection or approval
Utility confirms safe interconnection to the power grid
Some utilities may install a net meter during this visit
💡 Tip: You usually don’t need to be present for municipal inspections unless your home is gated or locked. Your installer may represent you.
1–3 weeks after installation, depending on inspector availability and local workload.
Once you pass all inspections, you’ll receive Permission to Operate (PTO) from your utility company.
This is the green light to turn on your system and start producing your own electricity. Your installer may guide you through the activation process, or they might do it remotely.
Once activated, your system:
Starts converting sunlight into electricity
Sends extra power back to the grid (if net metering is enabled)
Begins reducing your electric bill immediately
💡 Tip: Set up your monitoring app right away to track performance and savings!
1–2 weeks after final inspection
After activation, most solar companies will provide you with a final packet of documentation and basic training. This may include:
System manual and component datasheets
Warranty information (panels, inverter, workmanship)
Instructions for your monitoring platform
Contact info for support or service
Tips for basic maintenance and troubleshooting
Some installers also provide a warranty checklist and schedule follow-ups after a few months.
💡 Tip: Store all documents in a cloud folder or binder for future reference—especially if you ever sell your home.
While the process is generally safe, there are a few things you can do to help:
Keep pets and kids indoors during installation
Avoid parking vehicles near the work zone
Don’t climb on the roof to “check progress”
Notify your installer of any upcoming events (like out-of-town travel)
Here’s a general breakdown of the entire solar installation timeline:
| Stage | Time Estimate |
|---|---|
| Site Assessment | 1–3 days |
| Design & Permitting | 2–6 weeks |
| Installation | 1–3 days |
| Inspection & Utility Approval | 2–4 weeks |
| Total Time: | 4–10 weeks |
Note: Timelines can vary based on location, season, and installer availability.
Some things can slow down the process—but knowing about them in advance can help you stay prepared:
Permit approval delays from your local building authority
Weather issues during scheduled installation days
Outdated or undersized electrical panels that need upgrades
Roofing issues (e.g., leaks or repairs needed before install)
Utility company backlogs for net metering setup
💡 Pro Tip: Ask your installer about any red flags early in the process to avoid surprises later.
Once your system is live, there are a few smart steps you can take:
Use the mobile or web app to monitor output. Look for consistency with weather conditions.
Don’t panic if your first post-solar bill isn’t zero. Billing cycles and net metering credits can take a month or two to normalize.
Follow maintenance best practices to ensure long-term performance. (See our guide: Tips for Maintaining Your Solar Panels.)
If eligible, file for the federal solar tax credit (ITC) and any local rebates after installation.
Knowing what to expect during the solar panel installation process helps you:
Stay informed and proactive
Minimize surprises or delays
Communicate effectively with your installer
Feel confident in your solar investment
The good news? Most of the heavy lifting is done by your solar company. Your main role is to choose a reputable installer, stay in touch throughout the process, and enjoy your new energy-efficient lifestyle once the system is live.
Q: Do I need to be home during installation?
Yes, especially during the beginning and end of the installation for access and walkthroughs.
Q: Will my power be out?
It may be turned off briefly during the electrical hookup,